Bunting Solar Project
126.1 MW generation in Frio, TX · In queue since October 2025 · Proposed COD September 2028
126.1 MW
Capacity
0
Components
7 months
In Queue
—
IA Status
COD target: 2028
Total Duration
2y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-15
The Bunting Solar Project is a proposed 126.1 MW solar generation project located in Frio County, Texas. Developed by H4 Solar Project LLC, the project consists of photovoltaic solar technology. It is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0450, with a queue entry date of October 21, 2025, and a proposed commercial operation date of September 15, 2028.
The point of interconnection (POI) for the project is a line tap on the 138kV line from Paloduro SW8 (#5866) to Pearsall Sub8 (#5895).
Generated from interconnection queue and public data sources
State
TX
County
Frio
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
H4 Solar Project LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
LINE TAP: 138kV PALODUROSW8 (#5866) TO PEARSALLSUB8 (#5895)
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Bunting Solar Project