Nabla Energy Storage II (ERCOT-28INR0466) — Project Summary

Queue ID
ERCOT-28INR0466
Capacity
750 MW
Technology
Battery
Status
active
Location
Parker, TX
Region
ERCOT
Developer
Nabla Park LLC
IA Status

Nabla Energy Storage II

ERCOT-28INR0466BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

750 MW hybrid in Parker, TX · In queue since November 2025 · Proposed COD September 2029

750 MW

Capacity

0

Components

6 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

3y 10m

Pre-Study0%
Queue EntryNov 5, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-17

About

The Nabla Energy Storage II project is a proposed 750 MW hybrid battery energy storage project located in Parker County, Texas. The developer is Nabla Park LLC. It is listed in the ERCOT interconnection queue as entry ERCOT-28INR0466, with a queue entry date of November 5, 2025, and a proposed commercial operation date of September 17, 2029.

The project is currently listed as active in the interconnection queue. The point of interconnection is on the 345 kV Line PARKER 5 1436 to BENBRK A T5 1869.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Parker

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Nabla Park LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tapping on the 345 kV Line PARKER 5 1436 to BENBRK A T5 1869

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.