Seven Angels Energy Storage I (ERCOT-28INR0472) — Project Summary

Queue ID
ERCOT-28INR0472
Capacity
514 MW
Technology
Battery
Status
active
Location
Hill, TX
Region
ERCOT
Developer
Seven Angels Infrastructure LLC
IA Status

Seven Angels Energy Storage I

ERCOT-28INR0472BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

514 MW hybrid in Hill, TX · In queue since November 2025 · Proposed COD December 2028

514 MW

Capacity

0

Components

6 months

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 1m

Pre-Study0%
Queue EntryNov 5, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

About

Seven Angels Energy Storage I is a proposed 514 MW hybrid battery energy storage project located in Hill County, Texas. Developed by Seven Angels Infrastructure LLC, the project entered the ERCOT interconnection queue as entry ERCOT-28INR0472 on November 5, 2025. The proposed commercial operation date is December 31, 2028.

The project is currently listed as active in the ERCOT queue. It consists of battery energy storage coupled with another unspecified technology. The point of interconnection is the 68090 Sam Switch Bus 345kV. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hill

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Seven Angels Infrastructure LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

68090 Sam Switch Bus 345kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.