Pease River Solar
276.35 MW generation in Foard, TX · In queue since December 2025 · Proposed COD June 2029
276.35 MW
Capacity
0
Components
5 months
In Queue
—
IA Status
COD target: 2029
Total Duration
3y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-30
Pease River Solar is a proposed 276.35 MW solar generation project located in Foard County, Texas. Developed by Pease River Solar LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-28INR0476. The project entered the ERCOT interconnection queue on December 2, 2025, with a proposed commercial operation date of June 30, 2029.
The project utilizes photovoltaic solar technology. It is currently listed as active in the interconnection queue.
Generated from interconnection queue and public data sources
State
TX
County
Foard
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Pease River Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Pease River Solar