Vertus Energy Storage 2
204.93 MW hybrid in Galveston, TX · In queue since January 2026 · Proposed COD February 2028
204.93 MW
Capacity
0
Components
4 months
In Queue
—
IA Status
COD target: 2028
Total Duration
2y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-02-15
Vertus Energy Storage 2 is a proposed 204.93 MW hybrid energy project located in Galveston County, Texas. The project, developed by Vertus Energy Storage 2 LLC, consists of battery energy storage. It is listed in the ERCOT interconnection queue as entry ERCOT-28INR0490, with a queue entry date of January 26, 2026, and a proposed commercial operation date of February 15, 2028.
The project is currently listed as active in the interconnection queue. The point of interconnection is the 38830 TNMAINLAND1 138 KV substation.
Generated from interconnection queue and public data sources
State
TX
County
Galveston
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Vertus Energy Storage 2 LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
38830 TNMAINLAND1 138 KV
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.