Vertus Energy Storage 2 (ERCOT-28INR0490) — Project Summary

Queue ID
ERCOT-28INR0490
Capacity
204.93 MW
Technology
Battery
Status
active
Location
Galveston, TX
Region
ERCOT
Developer
Vertus Energy Storage 2 LLC
IA Status

Vertus Energy Storage 2

ERCOT-28INR0490BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

204.93 MW hybrid in Galveston, TX · In queue since January 2026 · Proposed COD February 2028

204.93 MW

Capacity

0

Components

4 months

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

2y 1m

Pre-Study0%
Queue EntryJan 26, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-02-15

About

Vertus Energy Storage 2 is a proposed 204.93 MW hybrid energy project located in Galveston County, Texas. The project, developed by Vertus Energy Storage 2 LLC, consists of battery energy storage. It is listed in the ERCOT interconnection queue as entry ERCOT-28INR0490, with a queue entry date of January 26, 2026, and a proposed commercial operation date of February 15, 2028.

The project is currently listed as active in the interconnection queue. The point of interconnection is the 38830 TNMAINLAND1 138 KV substation.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Galveston

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Vertus Energy Storage 2 LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

38830 TNMAINLAND1 138 KV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.