Aurelius 3 Solar (ERCOT-29INR0011) — Project Summary

Queue ID
ERCOT-29INR0011
Capacity
445.4 MW
Technology
Solar
Status
active
Location
Deaf Smith, TX
Region
ERCOT
Developer
IP Roman III, LLC
IA Status
Facility Study

Aurelius 3 Solar

ERCOT-29INR0011BetaActiveSolarERCOTLBNL + Live

445.4 MW generation in Deaf Smith, TX · In queue since December 2023 · Proposed COD March 2029

445.4 MW

Capacity

1

Components

Solar

2y 5m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

5y 3m

Facilities Study50%
Queue EntryDec 4, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-31

About

The Aurelius 3 Solar project is a proposed solar generation facility with a total capacity of 445.4 MW. Located in Deaf Smith County, Texas, the project is being developed by IP Roman III, LLC. It is currently listed as active in the ERCOT interconnection queue under queue ID ERCOT-29INR0011, with an interconnection request date of December 4, 2023. The proposed commercial operation date is March 31, 2029, and the project's interconnection status is currently in the Facility Study phase.

The point of interconnection for Aurelius 3 Solar is the 23908 Deaf Smith station 345 kV. The interconnection request includes a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Deaf Smith

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

IP Roman III, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.