Infinium Solar
401.6 MW generation in Howard, TX · In queue since August 2024 · Proposed COD July 2029
401.6 MW
Capacity
1
Components
Solar
1y 9m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
4y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-01
The proposed Infinium Solar project is a 401.6 MW solar generation facility located in Howard County, Texas. The project, under development by NextEra Energy Interconnection Holdings, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0019, with a queue entry date of August 16, 2024.
The project's proposed commercial operation date is July 1, 2029. Its interconnection status is currently in the Facility Study phase. The point of interconnection is #1058 Longshore_5 345kV. The Infinium Solar project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Howard
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
NextEra Energy Interconnection Holdings, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
#1058 Longshore_5 345kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
NextEra vs Duke
Comparative analysis covering fleet scale, performance trends, and growth pipeline.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
NextEra vs Duke
Comparative analysis covering fleet scale, performance trends, and growth pipeline.