Skyrider Wind (ERCOT-29INR0025) — Project Summary

Queue ID
ERCOT-29INR0025
Capacity
370 MW
Technology
Wind
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
NextEra Energy Interconnection Holdings, LLC
IA Status
Facility Study

Skyrider Wind

ERCOT-29INR0025BetaActiveWindERCOTLBNL + Live

370 MW generation in Pecos, TX · In queue since November 2024 · Proposed COD July 2028

370 MW

Capacity

1

Components

Wind

1y 6m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 8m

Facilities Study50%
Queue EntryNov 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-01

About

Skyrider Wind is a proposed 370 MW wind generation project located in Pecos County, Texas. The developer is NextEra Energy Interconnection Holdings, LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0025, with a queue entry date of November 19, 2024. The proposed commercial operation date is July 1, 2028. The project's interconnection status is currently in the Facility Study phase.

The point of interconnection (POI) is the 138kV #38365 TNPINION. The project consists of 370 MW of wind generation capacity. The Skyrider Wind project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NextEra Energy Interconnection Holdings, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

138kV #38365 TNPINION

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.