Homestead Power
260.3 MW generation in Austin, TX · In queue since July 2024 · Proposed COD December 2029
260.3 MW
Capacity
1
Components
Gas
1y 10m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
5y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-15
Homestead Power is a proposed 260.3 MW gas-fired generation project located in Austin County, Texas. The project, developed by Homestead Power LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0041, with a queue entry date of July 30, 2024. The proposed commercial operation date is December 15, 2029.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 138 kV New Bremen #7271. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
TX
County
Austin
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Homestead Power LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138 kV New Bremen #7271
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Homestead Power