Veco Ranch Solar SLF
152.5 MW generation in Webb, TX · In queue since July 2024 · Proposed COD August 2029
152.5 MW
Capacity
1
Components
Solar
1y 10m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
5y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-08-30
The Veco Ranch Solar SLF project is a proposed solar generation facility with a total capacity of 152.5 MW. Located in Webb County, Texas, the project is being developed by Orion US Land Holding Co LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-29INR0045, with a queue entry date of July 30, 2024.
The proposed commercial operation date for the Veco Ranch Solar SLF project is August 30, 2029. Its interconnection status is currently in the Facility Study phase.
Generated from interconnection queue and public data sources
State
TX
County
Webb
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Orion US Land Holding Co LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
8283 ASHERTON4A 138kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Veco Ranch Solar SLF