Rippling Curve Peaking Power
208 MW generation in Harris, TX · In queue since September 2024 · Proposed COD January 2029
208 MW
Capacity
1
Components
Gas
1y 8m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-01-01
Rippling Curve Peaking Power is a proposed 208 MW gas-fired generation project located in Harris County, Texas. The project, developed by OxyVinyls LP, is in the ERCOT interconnection queue as entry ERCOT-29INR0048, with a queue entry date of September 4, 2024. The proposed commercial operation date is January 1, 2029. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection for Rippling Curve Peaking Power is the 41580 TIDAL__X06B8 138kV substation. The project has appeared in recent news coverage regarding power generation projects in the ERCOT region.
Generated from interconnection queue and public data sources
State
TX
County
Harris
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
OxyVinyls LP
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
41580 TIDAL__X06B8 138kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Rippling Curve Peaking Power