7L Solar SLF
71.6 MW generation in Dimmit, TX · In queue since September 2025 · Proposed COD November 2029
71.6 MW
Capacity
0
Components
8 months
In Queue
—
IA Status
COD target: 2029
Total Duration
4y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-11-13
The 7L Solar SLF project is a proposed 71.6 MW solar generation project located in Dimmit County, Texas. Developed by 7L Solar, LLC, the project consists of photovoltaic solar technology. It is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0107, with a queue entry date of September 22, 2025, and a proposed commercial operation date of November 13, 2029. The point of interconnection is Tap 69kV 5870 Brundage - 5868 Big Wells.
Generated from interconnection queue and public data sources
State
TX
County
Dimmit
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
7L Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 69kV 5870 Brundage - 5868 Big Wells
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Brundage Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.