MilamStation Power Secured Gas Generation
846 MW generation in Milam, TX · In queue since March 2025 · Proposed COD November 2027
846 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
COD target: 2027
Total Duration
2y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-11-01
The MilamStation Power Secured Gas Generation project is a proposed 846 MW gas-fired combined-cycle generation project located in Milam County, Texas. Developed by Power Secured Holdings LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-29INR0120. The project entered the interconnection queue on March 24, 2025, with a proposed commercial operation date of November 1, 2027.
The interconnection point of contact is the #3377 LITTLE POND SWITCH 345kV. The project is currently listed as active in the ERCOT interconnection queue.
Generated from interconnection queue and public data sources
State
TX
County
Milam
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Power Secured Holdings LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
#3377 LITTLE POND SWITCH 345kv
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Show me the annual generation and analytical info for Castleton Energy Center.
Data-driven briefing on MilamStation Power Secured Gas Generation — fleet, generation, financial, and news signals.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.