Firefly Fields Storage (ERCOT-29INR0123) — Project Summary

Queue ID
ERCOT-29INR0123
Capacity
156.52 MW
Technology
Battery
Status
active
Location
Colorado, TX
Region
ERCOT
Developer
Firefly Fields Energy Center LLC
IA Status

Firefly Fields Storage

ERCOT-29INR0123BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

156.52 MW hybrid in Colorado, TX · In queue since March 2025 · Proposed COD September 2028

156.52 MW

Capacity

0

Components

1y 2m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 6m

Pre-Study0%
Queue EntryMar 24, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-30

About

Firefly Fields Storage is a proposed hybrid project located in Colorado County, Texas, with a total capacity of 156.52 MW. The project, developed by Firefly Fields Energy Center LLC, consists of battery energy storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0123, with a queue entry date of March 24, 2025, and a proposed commercial operation date of September 30, 2028.

The point of interconnection for Firefly Fields Storage is Tap 138 kV 57640 Rock Island to 7258 Glidden.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Colorado

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Firefly Fields Energy Center LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138 kV 57640 Rock Island to 7258 Glidden

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Firefly Fields Storage