Caesar Storage
205.5 MW hybrid in Borden, TX · In queue since July 2025 · Proposed COD November 2029
205.5 MW
Capacity
0
Components
10 months
In Queue
—
IA Status
COD target: 2029
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-11-26
The Caesar Storage project is a proposed 205.5 MW hybrid battery energy storage project located in Borden County, Texas. Developed by Caesar Solar, LLC, it is listed in the ERCOT interconnection queue as entry ERCOT-29INR0132, with a queue entry date of July 29, 2025. The proposed commercial operation date is November 26, 2029.
The project is currently listed as active in the interconnection queue. It is a hybrid project that includes battery energy storage along with another unspecified technology. The point of interconnection is the 59916 Buck Canyon 345 kV substation.
Generated from interconnection queue and public data sources
State
TX
County
Borden
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Caesar Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
59916 Buck Canyon 345 kV
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.