Elysium Energy Center BESS (ERCOT-29INR0145) — Project Summary

Queue ID
ERCOT-29INR0145
Capacity
100 MW
Technology
Battery
Status
active
Location
Fort Bend, TX
Region
ERCOT
Developer
Adapture Solar Development
IA Status

Elysium Energy Center BESS

ERCOT-29INR0145BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

100 MW hybrid in Fort Bend, TX · In queue since April 2025 · Proposed COD January 2030

100 MW

Capacity

0

Components

1y 1m

In Queue

IA Status

COD target: 2030

Interconnection

Total Duration

4y 9m

Pre-Study0%
Queue EntryApr 21, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-01-17

About

The Elysium Energy Center BESS is a proposed 100 MW battery energy storage project located in Fort Bend County, Texas. Developed by Adapture Solar Development, the project is a hybrid development in the ERCOT interconnection queue under queue ID ERCOT-29INR0145. The project entered the queue on April 21, 2025, with a proposed commercial operation date of January 17, 2030.

The project is currently listed as active in the ERCOT queue. The point of interconnection is the 44030 Arcola 138 kV substation. The project has appeared in recent news coverage regarding energy storage development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Fort Bend

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Adapture Solar Development

Utility

Entity

ERCOT

Service Type

Point of Interconnection

44030 Arcola 138 kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
Arcola Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Elysium Energy Center BESS