Cazadores Solar (ERCOT-29INR0160) — Project Summary

Queue ID
ERCOT-29INR0160
Capacity
301.62 MW
Technology
Solar
Status
active
Location
Duval, TX
Region
ERCOT
Developer
OCI Energy LLC
IA Status

Cazadores Solar

ERCOT-29INR0160BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

301.62 MW generation in Duval, TX · In queue since July 2025 · Proposed COD April 2029

301.62 MW

Capacity

0

Components

10 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

3y 9m

Pre-Study0%
Queue EntryJul 7, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-10

About

The Cazadores Solar project is a proposed 301.62 MW solar photovoltaic generation facility in Duval County, Texas. Developed by OCI Energy LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0160, with a queue entry date of July 7, 2025. The proposed commercial operation date is April 10, 2029. The point of interconnection is at (80079) CRUCE7A – (5901) MIGUEL5.

The Cazadores Solar project has been featured in recent news coverage related to deals.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Duval

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

OCI Energy LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

(80079) CRUCE7A – (5901) MIGUEL5

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.