Brazos Bend Storage SLF (ERCOT-29INR0164) — Project Summary

Queue ID
ERCOT-29INR0164
Capacity
243 MW
Technology
Battery
Status
active
Location
Milam, TX
Region
ERCOT
Developer
Grenergy USA
IA Status

Brazos Bend Storage SLF

ERCOT-29INR0164BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

243 MW hybrid in Milam, TX · In queue since September 2025 · Proposed COD September 2029

243 MW

Capacity

0

Components

8 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

4 years

Pre-Study0%
Queue EntrySep 11, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-17

About

The Brazos Bend Storage SLF project is a proposed 243 MW hybrid battery storage project located in Milam County, Texas. Developed by Grenergy USA, the project consists of battery energy storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0164, with a queue entry date of September 11, 2025, and a proposed commercial operation date of September 17, 2029.

The project's point of interconnection (POI) is on the 345 kV Line (3765) GRISTMILL_5 to (39950) TNTNP_ONE_3. The project has appeared in recent news coverage regarding energy storage development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Grenergy USA

Utility

Entity

ERCOT

Service Type

Point of Interconnection

345 kV Line (3765) GRISTMILL_5 to (39950) TNTNP_ONE_3

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Brazos Bend Storage SLF