LOST PINES GAS RECIP (ERCOT-29INR0166) — Project Summary

Queue ID
ERCOT-29INR0166
Capacity
113.02 MW
Technology
Gas
Status
active
Location
Bastrop, TX
Region
ERCOT
Developer
LCRA
IA Status

LOST PINES GAS RECIP

ERCOT-29INR0166BetaActiveGasInternal CombustionERCOTLive · ERCOT

113.02 MW generation in Bastrop, TX · In queue since July 2025 · Proposed COD August 2029

113.02 MW

Capacity

0

Components

10 months

In Queue

IA Status

Signed Dec 2025

Interconnection

Queue → IA

5 months

IA → COD

3y 8m

Total Duration

5 months

Construction0%
Queue EntryJul 7, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 26, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2029-08-02

About

The LOST PINES GAS RECIP project is a proposed 113.02 MW natural gas-fired generation project located in Bastrop County, Texas. The developer is LCRA. The project consists of internal combustion technology.

The project is listed in the ERCOT interconnection queue as entry ERCOT-29INR0166, with a queue entry date of July 7, 2025, and a proposed commercial operation date of August 2, 2029. An Interconnection Agreement (IA) was executed on December 26, 2025. The point of interconnection is the LOST PINES 345 kV substation (#170174). The project is currently listed as active in the queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bastrop

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

LCRA

Utility

Entity

ERCOT

Service Type

Point of Interconnection

(#170174) LOST PINES 345 kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.