Big Watt Power Austin-1 (ERCOT-29INR0167) — Project Summary

Queue ID
ERCOT-29INR0167
Capacity
448.98 MW
Technology
Gas
Status
active
Location
Caldwell, TX
Region
ERCOT
Developer
Big Watt Power Austin-1 LLC
IA Status

Big Watt Power Austin-1

ERCOT-29INR0167BetaActiveGasCombined-CycleERCOTLive · ERCOT

448.98 MW generation in Caldwell, TX · In queue since October 2025 · Proposed COD November 2028

448.98 MW

Capacity

0

Components

7 months

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 1m

Pre-Study0%
Queue EntryOct 3, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-11-01

About

Big Watt Power Austin-1 is a proposed 448.98 MW gas-fired combined-cycle generation project located in Caldwell County, Texas. The project, developed by Big Watt Power Austin-1 LLC, is in the ERCOT interconnection queue as entry ERCOT-29INR0167, with a queue entry date of October 3, 2025. Its proposed commercial operation date is November 1, 2028. The point of interconnection is planned for tapping the 345 kV double circuit line between Zorn (Bus# 7042) and Lytton Springs (Bus# 9074), and between Zorn (Bus# 7042) and Austrop (Bus# 7040).

The project currently has an active status in the interconnection queue and has been mentioned in recent industry news.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Caldwell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Big Watt Power Austin-1 LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tapping the 345 kV Double circuit Line: Zorn (Bus# 7042) - Lytton Springs (Bus# 9074) and Zorn (Bus# 7042) - Austrop (Bus# 7040).

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.