Palisade BESS (ERCOT-29INR0174) — Project Summary

Queue ID
ERCOT-29INR0174
Capacity
153.5 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
Flexen USA LLC
IA Status

Palisade BESS

ERCOT-29INR0174BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

153.5 MW hybrid in Brazoria, TX · In queue since September 2025 · Proposed COD October 2029

153.5 MW

Capacity

0

Components

8 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

4y 1m

Pre-Study0%
Queue EntrySep 23, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-10-01

About

The Palisade BESS project is a proposed 153.5 MW hybrid battery energy storage project located in Brazoria County, Texas. Developed by Flexen USA LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0174, with a queue entry date of September 23, 2025. The proposed commercial operation date is October 1, 2029.

The project consists of battery energy storage and another unspecified technology. It is slated to connect to the Hoffman (42810) - Lake Jackson (42880) 138 kV line. The Palisade BESS project has appeared in recent news coverage regarding energy storage development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Flexen USA LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Hoffman (42810) - Lake Jackson (42880) 138 kV line

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Palisade BESS