Rattlesnake Gap Solar SLF (ERCOT-29INR0178) — Project Summary

Queue ID
ERCOT-29INR0178
Capacity
93 MW
Technology
Solar
Status
active
Location
Howard, TX
Region
ERCOT
Developer
ET Fuels US Inc.
IA Status

Rattlesnake Gap Solar SLF

ERCOT-29INR0178BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

93 MW generation in Howard, TX · In queue since September 2025 · Proposed COD June 2029

93 MW

Capacity

0

Components

8 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

3y 9m

Pre-Study0%
Queue EntrySep 22, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

About

The Rattlesnake Gap Solar SLF project is a proposed 93 MW solar generation facility in Howard County, Texas. The project, under development by ET Fuels US Inc., is located within the ERCOT region and consists of photovoltaic solar technology.

The project is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0178, with a queue entry date of September 22, 2025. The proposed commercial operation date is June 1, 2029.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Howard

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ET Fuels US Inc.

Utility

Entity

ERCOT

Service Type

Point of Interconnection

10119 Tributary Switch 138 kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.