Gridline Solar (ERCOT-29INR0184) — Project Summary

Queue ID
ERCOT-29INR0184
Capacity
400 MW
Technology
Solar
Status
active
Location
Crockett, TX
Region
ERCOT
Developer
Big Lake Ranch LLC
IA Status

Gridline Solar

ERCOT-29INR0184BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

400 MW generation in Crockett, TX · In queue since August 2025 · Proposed COD July 2029

400 MW

Capacity

0

Components

9 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

3y 11m

Pre-Study0%
Queue EntryAug 18, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-01

About

Gridline Solar is a proposed 400 MW solar photovoltaic generation project located in Crockett County, Texas. The project, developed by Big Lake Ranch LLC, is in the ERCOT interconnection queue as entry ERCOT-29INR0184, with a queue entry date of August 18, 2025. The proposed commercial operation date is July 1, 2029, at the point of interconnection 76005 Schneeman Draw LCRA.

The Gridline Solar project has been mentioned in recent news coverage related to the electric grid and the energy industry.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Crockett

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Big Lake Ranch LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

76005 Schneeman Draw LCRA

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.