Velveteen Solar I
502.2 MW generation in Baylor, TX · In queue since December 2025 · Proposed COD October 2029
502.2 MW
Capacity
0
Components
5 months
In Queue
—
IA Status
COD target: 2029
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-10-15
Velveteen Solar I is a proposed 502.2 MW solar generation project located in Baylor County, Texas. The project, under development by Velveteen Solar, LLC, consists of photovoltaic solar technology. It is listed in the ERCOT interconnection queue as entry ERCOT-29INR0198, with a queue entry date of December 23, 2025, and a proposed commercial operation date of October 15, 2029.
The point of interconnection for Velveteen Solar I is planned at a tap into the 6076 FOXTAIL- 6100 OKLAUNION line. The project is currently listed as active in the ERCOT queue. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Baylor
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Velveteen Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap into 6076 FOXTAIL- 6100 OKLAUNION
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the powerplantsinfo.org database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the powerplantsinfo.org database.