Kickstart Energy Storage V
999 MW hybrid in Ellis, TX · In queue since November 2025 · Proposed COD December 2029
999 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2029
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-31
Kickstart Energy Storage V is a proposed 999 MW hybrid energy project in Ellis County, Texas. Developed by Kickstart Infrastructure LLC, the project consists of battery energy storage and another unspecified technology. It is located within the ERCOT region and interconnected at the 345 KV Venus 1906 to Fort Smith 3389 point of interconnection.
The project, identified as ERCOT-29INR0217 in the ERCOT interconnection queue, entered the queue on November 24, 2025. Its proposed commercial operation date is December 31, 2029. The project's interconnection status is currently active.
Generated from interconnection queue and public data sources
State
TX
County
Ellis
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Kickstart Infrastructure LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345 KV Venus 1906 to Fort Smith 3389
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.