Oak Belt Storage
207 MW hybrid in Victoria, TX · In queue since December 2025 · Proposed COD October 2029
207 MW
Capacity
0
Components
5 months
In Queue
—
IA Status
COD target: 2029
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-10-15
The proposed Oak Belt Storage project is a 207 MW hybrid battery energy storage development in Victoria County, Texas. Developed by Oak Belt Storage, LLC, the project consists of battery energy storage and other unspecified technologies.
The project is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0244, with a queue entry date of December 23, 2025. The proposed commercial operation date is October 15, 2029. The point of interconnection is at Tap 138kV (Bus #5506) FURHMANSB8 - (Bus #5584) VANDERBILTSW8.
Generated from interconnection queue and public data sources
State
TX
County
Victoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Oak Belt Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV (Bus #5506) FURHMANSB8 - (Bus #5584) VANDERBILTSW8
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Oak Belt Storage