Lightcycle Energy Storage (ERCOT-29INR0249) — Project Summary

Queue ID
ERCOT-29INR0249
Capacity
409.69 MW
Technology
Battery
Status
active
Location
Fayette, TX
Region
ERCOT
Developer
Lightcycle Energy Storage LLC
IA Status

Lightcycle Energy Storage

ERCOT-29INR0249BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

409.69 MW hybrid in Fayette, TX · In queue since January 2026 · Proposed COD May 2029

409.69 MW

Capacity

0

Components

4 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

3y 4m

Pre-Study0%
Queue EntryJan 13, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-05-01

About

Lightcycle Energy Storage is a proposed hybrid energy project in Fayette County, Texas, being developed by Lightcycle Energy Storage LLC. The project, identified as ERCOT-29INR0249 in the ERCOT interconnection queue, consists of 409.69 MW of battery energy storage. The project entered the queue on January 13, 2026, and has a proposed commercial operation date of May 1, 2029.

The project is currently listed as active in the ERCOT queue. The point of interconnection is the 9042 Winchester 345 kV substation. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Fayette

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Lightcycle Energy Storage LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

9042 Winchester 345 kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WIPOPA_1_2
POI Substation
Winchester Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.