Los Toros Energy Center Solar SLF (ERCOT-29INR0255) — Project Summary

Queue ID
ERCOT-29INR0255
Capacity
401.4 MW
Technology
Solar
Status
active
Location
Dawson, TX
Region
ERCOT
Developer
Los Toros Energy Center, LLC
IA Status

Los Toros Energy Center Solar SLF

ERCOT-29INR0255BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

401.4 MW generation in Dawson, TX · In queue since February 2026 · Proposed COD September 2029

401.4 MW

Capacity

0

Components

3 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

3y 7m

Pre-Study0%
Queue EntryFeb 25, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-01

About

The Los Toros Energy Center Solar SLF project is a proposed 401.4 MW solar generation facility in Dawson County, Texas. The project, being developed by Los Toros Energy Center, LLC, is interconnected within the ERCOT region under queue ID ERCOT-29INR0255. It entered the interconnection queue on February 25, 2026, with a proposed commercial operation date of September 1, 2029.

The project is currently listed as active in the ERCOT interconnection queue. It utilizes photovoltaic solar technology. Recent news coverage has discussed the development project.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Dawson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Los Toros Energy Center, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1169 ALKALI_LAKE 138kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.