Solgen Solar
160.2 MW generation in Lampasas, TX · In queue since April 2025 · Proposed COD August 2029
160.2 MW
Capacity
0
Components
1y 1m
In Queue
—
IA Status
COD target: 2029
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-08-30
The proposed Solgen Solar project is a 160.2 MW solar generation facility located in Lampasas County, Texas. Developed by Lampasas Hybrid Energy LLC, the project consists of photovoltaic solar technology. It is currently active in the ERCOT interconnection queue as entry ERCOT-30INR0037, with a queue entry date of April 25, 2025.
The proposed commercial operation date (COD) for Solgen Solar is August 30, 2029. The point of interconnection (POI) is the 7066 Adamsville 138kV line. The project has appeared in recent news coverage regarding renewable energy development in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Lampasas
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Lampasas Hybrid Energy LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
7066 Adamsville 138kV
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Adamsville Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.