Bell Song Solar 2 (ERCOT-30INR0049) — Project Summary

Queue ID
ERCOT-30INR0049
Capacity
167.6 MW
Technology
Solar
Status
active
Location
Jim Hogg, TX
Region
ERCOT
Developer
Bell Song Solar, LLC 2
IA Status

Bell Song Solar 2

ERCOT-30INR0049BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

167.6 MW generation in Jim Hogg, TX · In queue since June 2025 · Proposed COD March 2030

167.6 MW

Capacity

0

Components

11 months

In Queue

IA Status

COD target: 2030

Interconnection

Total Duration

4y 9m

Pre-Study0%
Queue EntryJun 12, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-03-16

About

Bell Song Solar 2 is a proposed solar generation project located in Jim Hogg County, Texas, with a total capacity of 167.6 MW. The project, being developed by Bell Song Solar, LLC 2, consists of photovoltaic solar technology. It is currently active in the ERCOT interconnection queue as entry ERCOT-30INR0049, with a queue entry date of June 12, 2025, and a proposed commercial operation date of March 16, 2030.

The point of interconnection is Tap 345kV (#80079) CRUCE7A - (#80355) DELSOL7A ckt 1. The development has been mentioned in recent news coverage related to the energy industry.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Jim Hogg

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Bell Song Solar, LLC 2

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV (#80079) CRUCE7A - (#80355) DELSOL7A ckt 1

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Bell Song Solar 2