Lost Pines Power Park (ERCOT-30INR0052) — Project Summary

Queue ID
ERCOT-30INR0052
Capacity
880 MW
Technology
Gas
Status
active
Location
Bastrop, TX
Region
ERCOT
Developer
LCRA
IA Status

Lost Pines Power Park

ERCOT-30INR0052BetaActiveGasCombined-CycleERCOTLive · ERCOT

880 MW generation in Bastrop, TX · In queue since June 2025 · Proposed COD December 2030

880 MW

Capacity

0

Components

11 months

In Queue

IA Status

Signed Dec 2025

Interconnection

Queue → IA

6 months

IA → COD

5 years

Total Duration

6 months

Construction0%
Queue EntryJun 19, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 26, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2030-12-15

About

The Lost Pines Power Park is a proposed 880 MW gas-fired combined-cycle generation project located in Bastrop County, Texas. Developed by LCRA, the project is interconnected within the ERCOT region under queue ID ERCOT-30INR0052. It entered the ERCOT interconnection queue on June 19, 2025, with a proposed commercial operation date of December 15, 2030, and an Interconnection Agreement (IA) date of December 26, 2025. The point of interconnection is the Lost Pines 345 kV substation.

This development project is linked to the existing Lost Pines 1 Power Project operating plant (EIA ID 55154). The confidence level of the match between the proposed project and the existing plant is 79%. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bastrop

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

LCRA

Utility

Entity

ERCOT

Service Type

Point of Interconnection

(#170174) LOST PINES 345 kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
LOS_LOSTPGT1
POI Substation
Lost Pines Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.