Prairie Ridge (Gas - CC) (ERCOT-30INR0071) — Project Summary

Queue ID
ERCOT-30INR0071
Capacity
1660.4 MW
Technology
Gas
Status
active
Location
Franklin, TX
Region
ERCOT
Developer
Tenaska Power Generation, LLC
IA Status

Prairie Ridge (Gas - CC)

ERCOT-30INR0071BetaActiveGasCombined-CycleERCOTLive · ERCOT

1,660.4 MW generation in Franklin, TX · In queue since December 2025 · Proposed COD June 2032

1,660.4 MW

Capacity

0

Components

5 months

In Queue

IA Status

COD target: 2032

Interconnection

Total Duration

6y 6m

Pre-Study0%
Queue EntryDec 1, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2032-06-01

About

The Prairie Ridge (Gas - CC) project is a proposed 1660.4 MW natural gas combined-cycle generation project located in Franklin County, Texas. The project is being developed by Tenaska Power Generation, LLC. It is listed in the ERCOT interconnection queue as entry ERCOT-30INR0071, with a queue entry date of December 1, 2025. The proposed commercial operation date is June 1, 2032.

The point of interconnection (POI) for the project is the TAP 345 KV line between substations 11699 WOODARD and 11702 BEARPEN. The project currently has an active status within the ERCOT interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Franklin

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tenaska Power Generation, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

TAP 345 KV 11699 WOODARD - 11702 BEARPEN

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Woodward

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.