Bulldog Power II
311 MW generation in Brazoria, TX · In queue since December 2025 · Proposed COD September 2030
311 MW
Capacity
0
Components
5 months
In Queue
—
IA Status
COD target: 2030
Total Duration
4y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-09-30
Bulldog Power II is a proposed 311 MW gas-fired generation project located in Brazoria County, Texas. The project, utilizing gas combustion turbine technology, is being developed by Bulldog Power II LLC. It is listed in the ERCOT interconnection queue as entry ERCOT-30INR0073, with a queue entry date of December 16, 2025, and a proposed commercial operation date of September 30, 2030. The point of interconnection is the 39703 TNMP FM524 Substation at 138kV.
The Bulldog Power II project has been the subject of recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Bulldog Power II LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
39703 TNMP FM524 Substation 138kV
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.