Permian I Wind (ERCOT-30INR0086) — Project Summary

Queue ID
ERCOT-30INR0086
Capacity
636.52 MW
Technology
Wind
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
S&S Renewables, LLC
IA Status

Permian I Wind

ERCOT-30INR0086BetaActiveWindWind TurbineERCOTLive · ERCOT

636.52 MW generation in Pecos, TX · In queue since January 2026 · Proposed COD June 2030

636.52 MW

Capacity

0

Components

4 months

In Queue

IA Status

COD target: 2030

Status
Project statusApprovedPower Engineering · 2025-09-29
Interconnection

Total Duration

4y 5m

Pre-Study0%
Queue EntryJan 26, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-06-30

About

Permian I Wind is a proposed wind generation project located in Pecos County, Texas, within the ERCOT region. The project, developed by S&S Renewables, LLC, has a total capacity of 636.52 MW. It is listed in the ERCOT interconnection queue as entry ERCOT-30INR0086, with a queue entry date of January 26, 2026, and a proposed commercial operation date of June 30, 2030. The point of interconnection is the Tap TNMP White Baker (38435)–Bottlebrush (38441) 345-kV double-circuit.

The Permian I Wind project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

S&S Renewables, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.