Mistflower Energy Center Solar
401.62 MW generation in Runnels, TX · In queue since February 2026 · Proposed COD June 2030
401.62 MW
Capacity
0
Components
3 months
In Queue
—
IA Status
COD target: 2030
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-01
The Mistflower Energy Center Solar project is a proposed 401.62 MW solar photovoltaic generation facility in Runnels County, Texas. The project, developed by Mistflower Energy Center LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-30INR0088, with a queue entry date of February 25, 2026.
The proposed commercial operation date for the project is June 1, 2030. The point of interconnection is Tap 345kV 60072 ODYSSEUS7A– 60040 BLF_CRK7A. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Runnels
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Mistflower Energy Center LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 60072 ODYSSEUS7A– 60040 BLF_CRK7A
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.