113.02 MW generation in Bastrop, TX · In queue since July 2025 · Proposed COD May 2031
113.02 MW
Capacity
0
Components
10 months
In Queue
—
IA Status
Signed Dec 2025
Queue → IA
5 months
IA → COD
5y 5m
Total Duration
5 months
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 24–48 months
Proposed COD: 2031-05-10
The LOST PINES GAS RECIP PHASE 2 project is a proposed 113.02 MW gas-fired generation project located in Bastrop County, Texas. The project, utilizing internal combustion technology, is being developed by LCRA. It is currently active in the ERCOT interconnection queue as entry ERCOT-31INR0010, with a queue entry date of July 7, 2025, and a proposed commercial operation date of May 10, 2031. The project's interconnection agreement (IA) date is December 26, 2025, and its point of interconnection is the LOST PINES 345 kV substation.
The development project is listed in the ERCOT queue, indicating it is undergoing the interconnection process required to connect to the regional grid. The project's active status suggests that it is currently meeting the requirements of the interconnection process.
Generated from interconnection queue and public data sources
State
TX
County
Bastrop
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
LCRA
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
(#170174) LOST PINES 345 kV
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.