Project FPL-276 — Project Summary

Queue ID
FPL-276
Capacity
74.5 MW
Technology
Solar
Status
active
Location
Union, FL
Region
Southeast
Developer
FPL
IA Status
Facility Study

FPL-276

FPL-276BetaActiveSolarFPLLBNL

74.5 MW generation in Union, FL · In queue since June 2017 · Proposed COD July 2028

74.5 MW

Capacity

1

Components

Solar

8y 11m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

11y 1m

Facilities Study50%
Queue EntryJun 27, 2017

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-31

About

The proposed FPL-276 project is a 74.5 MW solar generation facility located in Union County, Florida. The project is being developed by Florida Power & Light (FPL) and is interconnected to the Florida Power & Light utility grid at the Bradford-Columbia 115kV point of interconnection.

The project is currently in the Facility Study phase of the interconnection process within the Florida Reliability Coordinating Council (FRCC) queue, having entered the queue on June 27, 2017. The proposed commercial operation date is July 31, 2028.

Generated from interconnection queue and public data sources

Project Details

State

FL

County

Union

Grid Region

Southeast

Market

Developer

FPL

Utility

Florida Power & Light

Entity

FPL

Service Type

Point of Interconnection

Bradford-Columbia 115kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.