FPL-303
74.5 MW generation in Martin, FL · In queue since June 2017 · Proposed COD January 2025
74.5 MW
Capacity
1
Components
Solar
8y 11m
In Queue
Facility Study
IA Status
COD target: 2025
Total Duration
7y 7m
Schedule
15 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-01-31
The proposed FPL-303 project is a 74.5 MW solar generation facility located in Martin County, Florida. The project is being developed by Florida Power & Light (FPL) and is interconnected to the Florida Power & Light utility grid. It is currently listed as an active project in the interconnection queue.
The project entered the queue on June 27, 2017, and has a proposed commercial operation date of January 31, 2025. Its interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is the Bridge-Indiantown #1 230kV substation.
Generated from interconnection queue and public data sources
State
FL
County
Martin
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Bridge-Indiantown #1 230kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.