FPL-306
74.5 MW generation in Brevard, FL · In queue since June 2017 · Proposed COD January 2026
74.5 MW
Capacity
1
Components
Solar
8y 11m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
8y 7m
Schedule
3 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-01-31
FPL-306 is a proposed solar generation project with a total capacity of 74.5 MW, located in Brevard County, Florida. The developer and interconnecting utility for the project is Florida Power & Light (FPL).
The project is listed as active in the Florida Power & Light interconnection queue with an entry date of June 27, 2017. The proposed commercial operation date is January 31, 2026, and the interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the Malabar-Midway 230kV line.
Generated from interconnection queue and public data sources
State
FL
County
Brevard
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Malabar-Midway 230kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-306