FPL-333
74.5 MW generation in Nassau, FL · In queue since February 2018 · Proposed COD January 2026
74.5 MW
Capacity
1
Components
Solar
8y 3m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
7y 11m
Schedule
3 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-01-31
FPL-333 is a proposed solar generation project with a total capacity of 74.5 MW. The development is located in Nassau County, Florida, and is being developed by Florida Power & Light (FPL). The project consists of 74.5 MW of solar photovoltaic generation.
The project is currently in the Florida Power & Light (FPL) interconnection queue with an entry date of February 13, 2018. The proposed commercial operation date is January 31, 2026. Its interconnection status is currently in the Facility Study phase.
Generated from interconnection queue and public data sources
State
FL
County
Nassau
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Duval-Yulee 230kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-333