Project FPL-339 — Project Summary

Queue ID
FPL-339
Capacity
74.5 MW
Technology
Solar
Status
active
Location
Hendry, FL
Region
Southeast
Developer
FPL
IA Status
Facility Study

FPL-339

FPL-339BetaActiveSolarFPLLBNL

74.5 MW generation in Hendry, FL · In queue since March 2018 · Proposed COD July 2027

74.5 MW

Capacity

1

Components

Solar

8y 2m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

9y 4m

Facilities Study50%
Queue EntryMar 21, 2018

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-07-31

About

The proposed FPL-339 project is a 74.5 MW solar generation project located in Hendry County, Florida. The developer is Florida Power & Light (FPL). It is interconnected to the Florida Power & Light system at the Alva-Corbett 230kV point of interconnection.

The project is currently in the Florida Reliability Coordinating Council (FRCC) interconnection queue with an entry date of March 21, 2018. Its interconnection status is listed as "Facility Study". The proposed commercial operation date is July 31, 2027.

Generated from interconnection queue and public data sources

Project Details

State

FL

County

Hendry

Grid Region

Southeast

Market

Developer

FPL

Utility

Florida Power & Light

Entity

FPL

Service Type

Point of Interconnection

Alva-Corbett 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.