FPL-344
74.5 MW generation in Baker, FL · In queue since May 2018 · Proposed COD January 2026
74.5 MW
Capacity
1
Components
Solar
8 years
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
7y 8m
Schedule
3 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-01-31
FPL-344 is a proposed solar generation project located in Baker County, Florida, with a total capacity of 74.5 MW. The developer and utility are both listed as FPL (Florida Power & Light). The project consists of 74.5 MW of solar photovoltaic generation.
The project is currently active in the Florida Power & Light interconnection queue, with an initial queue entry date of May 4, 2018. The proposed commercial operation date is January 31, 2026, and the interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the Duval-Raven 230kV substation.
Generated from interconnection queue and public data sources
State
FL
County
Baker
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Duval-Raven 230kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.