FPL-347
74.5 MW generation in St Lucie, FL · In queue since May 2018 · Proposed COD January 2029
74.5 MW
Capacity
1
Components
Solar
8 years
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
10y 8m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-01-31
FPL-347 is a proposed solar generation project with a total capacity of 74.5 MW. The project is located in St. Lucie County, Florida, within the Southeast region, and is being developed by Florida Power & Light (FPL). It consists of a single 74.5 MW solar component.
The project is currently in the Florida Power & Light (FPL) interconnection queue with a queue entry date of May 23, 2018. Its proposed commercial operation date is January 31, 2029, and its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the Sherman-Treasure 230kV line.
Generated from interconnection queue and public data sources
State
FL
County
St Lucie
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Sherman-Treasure 230kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-347