FPL-358
74.5 MW generation in Brevard, FL · In queue since July 2018 · Proposed COD July 2028
74.5 MW
Capacity
1
Components
Solar
7y 10m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
10 years
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-31
FPL-358 is a proposed solar generation project with a total capacity of 74.5 MW, located in Brevard County, Florida. The developer is Florida Power & Light (FPL). The project is interconnected to the Florida Power & Light system and is listed in their interconnection queue as of July 30, 2018. The proposed commercial operation date is July 31, 2028. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection (POI) for FPL-358 is the Heritage Solar-Malabar 230kV substation. The project consists of 74.5 MW of solar photovoltaic generation. The project has appeared in recent news coverage regarding FPL's renewable energy development plans in Florida.
Generated from interconnection queue and public data sources
State
FL
County
Brevard
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Heritage Solar-Malabar 230kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-358