Project FPL-376 — Project Summary

Queue ID
FPL-376
Capacity
74.5 MW
Technology
Solar
Status
active
Location
Baker, FL
Region
Southeast
Developer
FPL
IA Status
Facility Study

FPL-376

FPL-376BetaActiveSolarFPLLBNL

74.5 MW generation in Baker, FL · In queue since November 2019 · Proposed COD July 2027

74.5 MW

Capacity

1

Components

Solar

6y 6m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

7y 8m

Facilities Study50%
Queue EntryNov 22, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-07-31

About

FPL-376 is a proposed solar generation project with a total capacity of 74.5 MW, located in Baker County, Florida. The developer is Florida Power & Light (FPL). It is in the Florida Power & Light interconnection queue (Southeast region) as of November 22, 2019, with a proposed commercial operation date of July 31, 2027. The project's interconnection status is currently in the Facility Study phase.

The point of interconnection for FPL-376 is the Duval-Raven 230kV line. The project has appeared in recent news coverage regarding FPL's renewable energy development plans.

Generated from interconnection queue and public data sources

Project Details

State

FL

County

Baker

Grid Region

Southeast

Market

Developer

FPL

Utility

Florida Power & Light

Entity

FPL

Service Type

Point of Interconnection

Duval-Raven 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.