FPL-378
74.5 MW generation in Desoto, FL · In queue since November 2019 · Proposed COD January 2025
74.5 MW
Capacity
1
Components
Solar
6y 6m
In Queue
Facility Study
IA Status
COD target: 2025
Total Duration
5y 2m
Schedule
15 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-01-31
FPL-378 is a proposed solar generation project with a total capacity of 74.5 MW, located in Desoto County, Florida. The project is being developed by Florida Power & Light (FPL). It is interconnected within the Florida Power & Light queue (FPL) with a queue entry date of November 22, 2019. The proposed commercial operation date is January 31, 2025. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection for FPL-378 is the Orange River-Whidden 230kV substation. Recent news coverage has discussed this development project.
Generated from interconnection queue and public data sources
State
FL
County
Desoto
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Orange River-Whidden 230kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-378