Project FPL-403 — Project Summary

Queue ID
FPL-403
Capacity
74.5 MW
Technology
Solar
Status
active
Location
St. Lucie, FL
Region
Southeast
Developer
FPL
IA Status
Facility Study

FPL-403

FPL-403BetaActiveSolarFPLLBNL

74.5 MW generation in St. Lucie, FL · In queue since July 2020 · Proposed COD January 2025

74.5 MW

Capacity

1

Components

Solar

5y 10m

In Queue

Facility Study

IA Status

COD target: 2025

Interconnection

Total Duration

4y 6m

Schedule

15 months past proposed COD

Facilities Study50%
Queue EntryJul 21, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-01-31

About

FPL-403 is a proposed solar generation project located in St. Lucie County, Florida, with a total capacity of 74.5 MW. The developer is Florida Power & Light (FPL). The project is interconnected to the Florida Power & Light system at the Sweatt Substation.

The project entered the Florida Reliability Coordinating Council (FRCC) interconnection queue on July 21, 2020, and has a proposed commercial operation date of January 31, 2025. Its interconnection status is currently in the Facility Study phase.

Generated from interconnection queue and public data sources

Project Details

State

FL

County

St. Lucie

Grid Region

Southeast

Market

Developer

FPL

Utility

Florida Power & Light

Entity

FPL

Service Type

Point of Interconnection

Sweatt Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.