FPL-406
74.5 MW generation in St. Lucie, FL · In queue since July 2020 · Proposed COD January 2027
74.5 MW
Capacity
1
Components
Solar
5y 10m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
6y 6m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-01-31
FPL-406 is a proposed solar generation project with a total capacity of 74.5 MW, located in St. Lucie County, Florida. The developer is Florida Power & Light (FPL). The project is currently active in the Florida Power & Light interconnection queue, with an entry date of July 21, 2020, and a proposed commercial operation date of January 31, 2027. Its interconnection agreement status is currently in the Facility Study phase.
The project consists of 74.5 MW of solar photovoltaic generation. The point of interconnection is the Eldora Substation.
Generated from interconnection queue and public data sources
State
FL
County
St. Lucie
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Eldora Sub
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.