FPL-407
74.5 MW generation in St. Lucie, FL · In queue since July 2020 · Proposed COD January 2027
74.5 MW
Capacity
1
Components
Solar
5y 10m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
6y 6m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-01-31
FPL-407 is a proposed solar generation project with a total capacity of 74.5 MW, located in St. Lucie County, Florida. The developer and interconnecting utility for the project is Florida Power & Light (FPL). It is currently an active project in the FPL interconnection queue, with an entry date of July 21, 2020. The proposed commercial operation date is January 31, 2027, and the project is currently in the Facility Study phase of the interconnection process.
The point of interconnection for FPL-407 is the Eldora Substation.
Generated from interconnection queue and public data sources
State
FL
County
St. Lucie
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Eldora Sub
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.