FPL-409
74.5 MW generation in Desoto, FL · In queue since July 2020 · Proposed COD January 2025
74.5 MW
Capacity
1
Components
Solar
5y 10m
In Queue
Facility Study
IA Status
COD target: 2025
Total Duration
4y 6m
Schedule
15 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-01-31
FPL-409 is a proposed solar generation project with a total capacity of 74.5 MW, located in Desoto County, Florida. The developer and interconnecting utility is Florida Power & Light (FPL). The project entered the Florida Power & Light interconnection queue on July 21, 2020, with a proposed commercial operation date of January 31, 2025. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is the Bermont Substation.
The proposed project consists of 74.5 MW of solar photovoltaic generation. It is listed as an active project in the interconnection queue. The project has appeared in recent news coverage regarding FPL's renewable energy development plans.
Generated from interconnection queue and public data sources
State
FL
County
Desoto
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Bermont Substation
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-409